Project Type
Specialised resurfacing construction support for SPA and BLU upgrades on the Broad Gauge MTM and V-Line Networks
Machines Used
All Rounder Tamper, All Rounder Regulator
Date Completed
2021
Project Overview
Brimble was engaged to support the construction resurfacing works of the SPA Alliance works that were part of the Level Crossing Removal Project on the MTM network as well as the Turnout Construction of the BLU Upgrades on the V-line Network.
This project was both large and complex, requiring highly accurate resurfacing through new elevated platforms and tolerances that included large vertical curve alignment challenges.
All works were delivered safely and to the highest standards.