Project Type
Specialised resurfacing construction support for Edmonton to Gordanvale (E2G) project
Machines Used
Production Tamper, Production Regulator
Date Completed
April 2022
Project Overview
Brimble was engaged to support the specialist construction works which included the re-alignment of the North Coast Main line to allow for the widening of the Bruce Highway. This was a major project and one of the first of its type delivered by specialist contractors. The project was built along side the existing rail corridor and meant that access to the site was only accessible by crane and trucks initially and then the existing main line tied into the new construction track during tight network shutdowns.
The standards required for these works were high and Brimble provided the technical approach, machines and teams to deliver the project as planned in our consistent reliable and safe approach.